Description
Toshiba 202199 Long Lead Filter – 230-600 Volt, 10/25/30 HP, Open, 35 FLA – 12″ x 8″ x 9″ (HxWxD)
Original price was: $978.60.$391.44Current price is: $391.44.
Toshiba 202199 Long Lead Filter – 230-600 Volt, 10/25/30 HP, Open, 35 FLA – 12″ x 8″ x 9″ (HxWxD)